Electrical fault takes down Ophir

LESS than three months into operation and Octanex’s flagship Ophir oil field development has experienced a “non-routine production shutdown” following power issues on the FPSO MTC Ledang.

  • Haydn Black
  • 09 January 2018
  • 10:04
  • News
Electrical fault takes down Ophir

EnergyNewsBulletin newsletter

Slugcatcher

Slugcatcher on the signals sent to the oil sector

Slugcatcher on the signals sent to the oil sector

Slugcatcher on the signals sent by the AWE takeover to the rest of the oil sector

Opinion

Slugcatcher and the optimism problem

Slugcatcher and the optimism problem

Is the oil price recovery too good to be true?

On the record

Equus hope for pipe

Equus hope for pipe

West-east pipeline could find a home for Equus and other regional discoveries: Quadrant expert.

company_profiles

Company Profiles

Upcoming Events