ASIA

Valemon platform fit for viewing: Video

STATOIL has released a video of its Valemon topsides heavy lift and installation operation in the Norwegian North Sea.

Valemon platform fit for viewing: Video

The topsides, produced by Samsung Heavy Industries, are the first Statoil has ever had built in South Korea. Transportation to Norway took 40 days. The lift of the 9750-tonne topsides onto the steel...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry