Helios progressing Presidio project 

HELIOS Energy has successfully completed drilling operations at its Presidio 141-2 well in Texas and is now looking to frac the well in July after observing “good to excellent” oil shows during while drilling. 

Helios progressing Presidio project  Helios progressing Presidio project  Helios progressing Presidio project  Helios progressing Presidio project  Helios progressing Presidio project 
 
The well was drilled to a total measured depth of 5,846 feet which includes a 1,400ft horizontal portion targeting the lower bench of the Ojinaga formation.