OPERATIONS

Myall Creek 5A disappoints after water production leaves well shut in

ARMOUR Energy has connected its Myall Creek 5-A well to the Kincora gas pipeline network after producing first gas from the Basal Rewan formation, however due to unanticipated water production the well has been shut in.

Myall Creek 5A disappoints after water production leaves well shut in

  The company said the MC5A well had an initial flow rate of 2 million cubic feet per day, however the production rate was unable to be sustained after an influx of formation water. Investigations...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry