OPERATIONS

Central gearing up for Range FID 

CENTRAL Petroleum has drilled all three wells in its latest Range campaign and it will now install surface equipment and then downhole pumps. 

Central gearing up for Range FID 

The Queensland CSG project is a 50-50 joint venture between Central and fertiliser and explosives maker Incitec Pivot in the Surat Basin.    All three were drilled to between 675 metres and 685m and...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry