OPERATIONS

Strike and Talon work forward at Walyering-5

STRIKE Energy and Talon Petroleum are progressing appraisal work at their Walyering-5 well at EP447 in the Perth Basin.

On the cusp of reaching primary objectives

On the cusp of reaching primary objectives

Operator Strike holds a 55% interest in the well while Talon holds the rest, with the cost of the drilling to be shared by the parties on a two-thirds-one-third basis for the first A$9 million.  Strike...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry