OPERATIONS

Top End drilling wraps up for year

THE Top End drilling campaign by Santos and Tamboran Resources has finished for the year with Tanumbirini 3H cased and cemented and the Easternwell Rig 106 moved off site.

Top End drilling wraps up for year

Fraccing of wells Tanumbirini 2H, and 3H has begun and Tamboran says flow test results are expected next month in the Beetaloo Sub-basin in the Northern Territory.    "The EP161 joint venture will...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry