OPERATIONS

Pure's Botswana CSG resource upgraded 

PURE Hydrogen has seen a resource upgrade at its Botswana CSG play by 96% or to 315.7 billion cubic feet on a 2C basis. Work was carried out by independent certifiers Sproule and Associates. 

 Pure's Botswana drill team

Pure's Botswana drill team

Pure holds the Serowe project with local player Botala Energy, which is preparing to flow test well Serowe-3, in a 51-49 split. The well will be completed as a producer within a few months.    The...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry