The company said the rig crew mobilised to the site at the beginning of this week to set up on G27.
The program aims to isolate the lower Aramac sands and stop contribution to the water production.
ASX-listed Galilee Energy has commenced a remedial operations program for its Glenaras 27 and 28 well pilot.
The company said the rig crew mobilised to the site at the beginning of this week to set up on G27.
The program aims to isolate the lower Aramac sands and stop contribution to the water production.