DRILLING

Shell wildcat P&A

The 99% Shell-owned exploration well Herdsman-1 has been plugged and abandoned as a dry hole aft...

The 99% Shell-owned exploration well Herdsman-1 has been plugged and abandoned as a dry hole after wireline logs indicated no hydrocarbon presence.

Herdsman-1, located about 170km south of the Woodside's Enfield oil field, spudded on 28 January and was drilled to determine the geology of the area offshore from Exmouth and south of the existing North West Shelf discoveries.

The Woodside-operated obligation well was drilled in permit WA-299P that was issued to Shell in July 2000, and the work program during six years of tenure calls for two wells and upwards of $37 million in various studies.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

Future of Energy: The Role of Batteries Report 2026

The role of batteries and storage in Australia’s energy transition

editions

Future of Energy Report: Nuclear Power in Australia 2024

Energy News Bulletin’s new report examines what the energy and resources industry thinks of the idea of a nuclear-powered Australia.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.