Lakes prepares for Gippsland fraccing program

Lakes Oil is preparing for simultaneous fraccing programs of its Trifon-2 well and both the Wombat-1 and 2 wells next week. It has already cut two cores from the Gippsland Basin Trifon-2 well in preparation for the Trifon stimulation program.
Lakes prepares for Gippsland fraccing program
Lakes prepares for Gippsland fraccing program
Lakes prepares for Gippsland fraccing program
Lakes prepares for Gippsland fraccing program
Lakes prepares for Gippsland fraccing program

The Trifon Tight Gas Project is funded by Jarden Corporation Australia to the extent that the first $5 million of expenditure contributed by them will earn a 50% interest in a defined area which covers both the Trifon and Gangell structures and includes the North Seaspray-3 well.

Preparations have continued for the program at both the Wombat-1 and 2 wells on different levels, adding that this will be the first time fracture stimulation has been attempted in the Strzelecki Formation, which is gas bearing over a large area of the onshore and offshore Gippsland Basin.

The Trifon and Wombat wells are located in PEP 157, which is covered by an overriding royalty of 5% of the wellhead value of any hydrocarbon production payable to Roma Petroleum N.L.

loader

Most read TECHNOLOGY