Another producer at Growler field: Vicpet

VICTORIA Petroleum will complete the Growler-3 well in PRL 15, Cooper Basin, for production after the well flowed oil to surface at 1673 barrels per day with no water.

Another producer at Growler field: Vicpet Another producer at Growler field: Vicpet Another producer at Growler field: Vicpet Another producer at Growler field: Vicpet Another producer at Growler field: Vicpet

The company said it carried out a drill stem test over the interval 1717-1740m after wireline logs indicated the well had intersected a 19m oil column in the Birkhead Formation reservoir.

loader