Buru set to resume work at Leander-1

BURU Energy is preparing to sidetrack the Leander-1 well in the Canning Basin after it was unsuccessful in removing a stuck drill pipe in the well bore.

Buru set to resume work at Leander-1 Buru set to resume work at Leander-1 Buru set to resume work at Leander-1 Buru set to resume work at Leander-1 Buru set to resume work at Leander-1
loader

Most read TECHNOLOGY