Westside to drill Tilbrook T9 well

WESTSIDE Corporation is planning to drill the Tilbrook T9 coal seam gas well in the Bowen Basin's ATP 688P after interpreting results from the earlier Tilbrook-9a well.

Tilbrook-9a had intersected more than 9m of net coal and was subjected to two drill stem tests before it was cased and suspended as a future producer.

loader