Warro partners taking a different tack

PARTNERS in the Warro tight gas project in the onshore Perth Basin are now focusing on areas of the field without existing fault structures for future exploration.

Analysis of results from the Warro-3 flow testing after successful fracture stimulation had indicated the natural fractures in the field where it was drilled were acting as a conduit for water from

loader