EXPLORATION

Warro partners taking a different tack

PARTNERS in the Warro tight gas project in the onshore Perth Basin are now focusing on areas of the field without existing fault structures for future exploration.

Analysis of results from the Warro-3 flow testing after successful fracture stimulation had indicated the natural fractures in the field where it was drilled were acting as a conduit for water from shallower...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry