Wellhead installed onsite at Lockyer Deep

THE Perth Basin's Lockyer Deep-1 well has reached another milestone as Norwest Energy today announces drill depth has reached 1,205 metres in line with schedule and the wellhead installed. 

Wellhead installed onsite at Lockyer Deep Wellhead installed onsite at Lockyer Deep Wellhead installed onsite at Lockyer Deep Wellhead installed onsite at Lockyer Deep Wellhead installed onsite at Lockyer Deep