EXPLORATION

Woodside 2D seismic up for comment

WOODSIDE Petroleum's proposed 2D seismic plan for its offshore Northern Territory acreage is open for comment until 16 October with the Australian offshore regulator.

Galactic Hybrid Seismic schematics lodged with NOPSEMA

Galactic Hybrid Seismic schematics lodged with NOPSEMA

The full area will cover 16,373sq.km with Woodside to acquire 4475 lines of 2D seismic.  Woodside's Galactic Hybrid 2D acquisition will be within permit NT/P86 in the Bonaparte Basin and will take place...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry