Second Bedout well halfway home 

THE second well in the two well Bedout Sub-basin campaign is drilling ahead at 1470 metres, junior partner Carnarvon Energy said today. 

Second Bedout well halfway home  Second Bedout well halfway home  Second Bedout well halfway home  Second Bedout well halfway home  Second Bedout well halfway home 
The well is being drilled by operator Santos (80%) and Carnarvon (20%). 
 
The two successfully drilled Pavo-1 last month and are now 27 kilometres southwest at Apus-1.