GAS

First oil from Neptune in 2007: BHP and Woodside

THE Neptune partners have approved the US$850 million to develop the deepwater Gulf of Mexico oil and gas field, the companies announced yesterday.

First oil from Neptune in 2007: BHP and Woodside

BHP Billiton (35%) approved spending about US$300m on the development, and Woodside Energy (USA), a wholly owned subsidiary of Woodside Petroleum (20%), also gave the financial go ahead to spend $170m.

The other partners, Marathon Oil Corp (30%) and Repsol subsidiary, Maxus (US) Exploration (15%) have also approved their expenditure.

It is estimated the field contains from 100 to 150 million barrels of oil equivalent. The project is due to come online in late 2007.

Neptune will have a design capacity to produce up to 50,000 barrels of oil and 50 million cubic feet of gas per day.

The development is a major step forward for both Australian partners.

Neptune will expand BHP Billiton's producing assets in the gulf, the group's president of energy, Philip Aiken said.

“Neptune will be our first operated, deepwater standalone facility in the gulf and represents a significant milestone towards building a core business in that region,” he said.

”With [the] Mad Dog [field], which came onstream this year, Atlantis, which will start up in 2006, and now Neptune, BHP Billiton’s net production from the gulf will exceed 100,000 barrels of oil equivalent per day by the end of 2007,” Aiken said.

Neptune will also provide Woodside’s first deepwater Gulf of Mexico oil production.

The field is about 120 miles from the Louisiana coast. It comprises Atwater blocks 573, 574, 575, 617, and 618, in water depths ranging from 4,200 feet to 6,500ft. The production facility will be located in about 4,250ft of water.

A standalone, tension leg platform has been selected, part of proposed facilities, wells, and completions that are proven designs successfully used in the deepwater part of the gulf, BHP Billiton said.

The first oil is expected by the end of 2007 with seven initial subsea wells connected to the platform.

The wells, subsea systems, flowlines, floating systems, topsides and risers will be designed, procured, fabricated and operated by BHP Billiton on behalf of the Neptune joint venture partners.

The oil and gas will be exported to shore via the existing Caesar and Cleopatra trunk lines.

TOPICS:

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry