ENERGY TRANSITION

AGL the latest to build big battery in South Australia

AGL has announced it will build a 850MW grid-scale battery system on the site of the Torrens Island gas-fired power station, with the first stage to be operational by 2024.

AGL the latest to build big battery in South Australia

 The company announced over the weekend that the first stage would consist of up to 250MW of storage with a duration of up to four hours. AGL CEO and managing director Brett Redman said the project...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry