ENERGY TRANSITION

Alinta tipped to go ahead with Port Hedland solar project 

LOGGED a week ago on the EPA WA website, and announced at an industry conference last week, Alinta Energy has confirmed it will go ahead with the construction of a solar farm in the north of Western Australia in partnership with Fortescue. 

Jonathon Davidson
 Chichester solar farm from above

Chichester solar farm from above

The project takes in a 90 megawatt solar farm in the Pilbara and 30MW battery which will sit beside a gas-fired generator.    It already operates a big battery installation in Mt Newman and is finishing...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry