The company has sent the data to the Dayboro processing facility in Brisbane, adding that the final processed seismic data should be ready for interpretation by mid-July 2008.
The survey will provide a 1km by 1 km grid over the central part of the basin that is aimed at maturing leads along the Poonboon-Yolla trend to drillable prospects and to provide data over leads in the Dondu Trough that have poor seismic coverage.
Participants in the T/37P and T/38P survey are operator Cue (50%) and Exoil (50%).

