Top job

KBR has been awarded a front-end engineering and design contract for the topsides and hull associated with a double-sided, single-bottom hull floating production, storage and offloading vessel that will be located off Angola.

The FEED work is to start immediately and will take about 12 months.

KBR's scope covers the permanently moored FPSO using a spread mooring system.

loader