NEWS ARCHIVE

Intermoor hooks up in the Gulf

INTERMOOR has won a contract to design, fabricate and install 12 suction pile anchors, pre-set in...

The work will be conducted in the Mississippi Canyon 354 block of the US Gulf of Mexico. The project involves suction pile design, fabrication and installation followed by the pre-set mooring installation...

Start a free trial to continue reading this article

Already have an account?

Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

Future of Energy: The Role of Batteries Report 2026

The role of batteries and storage in Australia’s energy transition

editions

Future of Energy Report: Nuclear Power in Australia 2024

Energy News Bulletin’s new report examines what the energy and resources industry thinks of the idea of a nuclear-powered Australia.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.