Both wells were opened to natural flow and have been flowing at a combined rate of 100 barrels per day.
Pumps are being installed and once this work has been done the production rate is expected to reach 300bpd.
Interests in the PEL 104 JV are: Victoria Petroleum (operator) 40%, Impress Energy Limited 40% and Roma Petroleum 20%.