This article is 20 years old. Images might not display.
The field can now be bought into full production targeting rates at up to 4,000 bopd after tie-in of the well to the production facilities late June.
Jingemia -4 was the last of the scheduled wells in the field and intersected 29m of oil saturated Dongara Sandstone, with excellent reservoir characteristics.
Three cores were successfully cut through the entire Dongara Sandstone and Wagina Formation section, with 100% recovery. Preliminary interpretation of the cores and those wireline logs acquired to date indicate that Jingemia-4 has intersected the Dongara Sandstone approximately 16.5m updip of Jingemia-1.
Of the companies involved, Arc Energy and Voyager have entered into a number of agreements with Hardman that will see Arc’s interest in the field move to 33.141% and Voyager’s to 11%.
Currently participants in EP 413 are Origin Energy Developments (Operator) 49.189%, Hardman Oil and Gas 22.376%, ARC Energy 15.495%, Voyager (PB) 6.270%, Victoria Petroleum Offshore 5 %, Norwest Energy 1.278%, Roc Oil (WA) and 0.250% John Kevin Geary 0.142%