Production resumes at Cliff Head following low level spill

TRIANGLE Energy has begun operations again at its offshore Cliff Head platform after production shutdown last month when inclement weather caused a spill.

Production resumes at Cliff Head following low level spill Production resumes at Cliff Head following low level spill Production resumes at Cliff Head following low level spill Production resumes at Cliff Head following low level spill Production resumes at Cliff Head following low level spill

Cliff Head platform back in operation

 

The weather cracked a flow meter in mid-July and production was immediately halted after inspections saw fluid missing from the meter. 

 

A...