OPERATIONS

Commercial production at Glenaras expected soon

GALILEE Energy’s Glenaras gas project is heading into production with both the 10L and 12L wells beginning to level off allowing for gas desorption to begin.

Paul Hunt
Commercial production at Glenaras expected soon

  The two wells are on continuous production with water rates of 3500 barrels of water per day in aggregate, and both are currently producing below the critical desorption rate.    Casing pressure...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry