OPERATIONS

Byron Energy logs potential combined 77 feet of pay in GOM

BYRON Energy has identified likely oil pay in the L2 Sand and a possible gas/oil contact in the second primary N2 Sand target with Log While Drilling (LWD) electric logs at its South Marsh Island 58 G (SM58 G) platform in the Gulf of Mexico.

Colin Hay
 Byron-Energy.jpg

Byron-Energy.jpg

Logging final pay counts identified 10 foot of sand in the L1 sand, 24 foot in the L2 sand and 78 feet in the N2 sand in the SM58 G6 BP01 well. Byron's CEO Maynard Smith said the N2 Sand at the G6 BP01...

Start a free trial to continue reading this article

Already have an account?

Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry