OPERATIONS

PGN to build 367km crude pipeline from Rokan oil field

INDONESIAN state oil and gas utility PT Perusahaan Gas Negara is set to start construction of its 367 kilometre crude oil pipeline which will connect the Rokan oil field in Riau to a Pertamina refinery.

PGN to build 367km crude pipeline from Rokan oil field

  The Rokan Block is Indonesia's second-most productive oil field, located in Sumatra, and is estimated to produce 161,000 barrels of oil per day this year.  However, with increasing production from...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry