OPERATIONS

Gingin west gas plant progresses

EMPIRE Oil and Gas has said the design of the Gingin West gas and condensate plant in the Perth Basin that will be capable of processing 10 million cubic feet of gas and 500 barrels of condensate per day is moving ahead.

Gingin west gas plant progresses

The company said the design takes into consideration procurement of equipment, long lead items and the environment, with a separate plant site nearby to the Gingin West-1 and Red Gully-1 wells chosen to...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry