OPERATIONS

New mooring to boost Galoc output

THE Galoc joint venture has taken an important step towards the phase two development of the Galoc field, offshore Philippines, approving the installation of a new mooring and riser system for the Rubicon Intrepid floating, production, storage and offloading vessel.

New mooring to boost Galoc output

The turret mooring system should be installed in the fourth quarter and is expected to substantially increase the reliability and uptime of the FPSO to over 95%. Production from Galoc suffers during...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry