Carnarvon prepares for Dorado-3 flow tests

THE Santos (80%) and Carnarvon Petroleum (20%) joint venture have completed wireline logging operations at the Dorado-3 well and installed a 7 inch casing liner across the Caley and Baxter reservoirs in preparation for flow testing.

Carnarvon prepares for Dorado-3 flow tests Carnarvon prepares for Dorado-3 flow tests Carnarvon prepares for Dorado-3 flow tests Carnarvon prepares for Dorado-3 flow tests Carnarvon prepares for Dorado-3 flow tests

Dorado.jpg

 
This morning Carnarvon noted the rig is currently preparing equipment for flow testing operations which will take a few days.
  • FREE coverage of the coronavirus pandemic. Visit our COVID-19 hub
  • NEW: 2020 Social Licence Report - where is the industry heading? Read more
  • EMAGAZINE: ENB's latest special print edition is now online. Read here