WORLD

Sacgasco JV plans re-entry at Alvares 1

SACGASCO and its joint venture partners will re-enter the Alvares 1 well to test for gas resources in the Californian Sacramento Basin.

Paul Hunt
Sacgasco JV plans re-entry at Alvares 1

  Operator Sacgasco which holds a 39% interest in the project will test the integrity of the existing wellbore and then test a conventional reservoir zone and a newer fractured reservoir play concept. ...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry