Mud losses during the drilling of the Huinga well have been corrected to stand at around 28,000 barrels. EnergyReview.net has previously reported the figures as 280,000, for which we apologise.
Mud losses during the drilling of the Huinga well have been corrected to stand at around 28,000 b...
Mud losses during the drilling of the Huinga well have been corrected to stand at around 28,000 barrels. EnergyReview.net has previously reported the figures as 280,000, for which we apologise.
The role of batteries and storage in Australia’s energy transition
Energy News Bulletin’s new report examines what the energy and resources industry thinks of the idea of a nuclear-powered Australia.
ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive
ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.