DRILLING

QGC pushing ahead in Surat

QUEENSLAND Gas Company has resumed its three-well drilling campaign in the Walloon coal measures of ATP 574P, Surat Basin, as it works to prove up initial reserves for the permit by mid-2010.

Coring operations on the second well, Pinelands-1, started last week. Partner Victoria Petroleum said the well was coring ahead in the Walloon coal measures at a depth of 490m. The well is expected...

Start a free trial to continue reading this article
Already have an account?  
Subscribe now
MORE ON THIS TOPIC

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

A growing series of reports, each focused on a key discussion point for the energy sector, brought to you by the Energy News Bulletin Intelligence team.

editions

ENB CCS Report 2024

ENB’s CCS Report 2024 finds that CCS could be the much-needed magic bullet for Australia’s decarbonisation drive

editions

ENB Cost Report 2023

ENB’s latest Cost Report findings provide optimism as investments in oil and gas, as well as new energy rise.

editions

ENB Future of Energy Report 2023

ENB’s inaugural Future of Energy Report details the industry outlook on the medium-to-long-term future for the sector in the Asia Pacific region.

editions

ENB Cost Report 2021

This industry-wide report aims to understand current cost levels across the energy industry